Contract # 81933

Contract Name: Harmon Shop Replacement Phase V, Stage 2
Agency:Metro-North Railroad
Engineer:Jacobs - WSP, JV
Contract Amount:$365,093,000
Award Date:2018
Scope of Work:
ECCO III Enterprises, Inc. was part of the Joint Venture Team of Skanska/ECCO III/Jacobs Engineering & WSP (Previously Parson Brinkerhoff) to design and construct this large-scale Design-Build project that was awarded in October 2018. As primary contractor, ECCO III has completed several other projects at the Harmon site, including, but not limited to, Harmon Shop Replacement Phase V, Stage 1, the Croton Maintenance Facility and Employee Overpass, Facilities and Yard Improvements, and the Phase IV Shop Replacement projects. Valued at over $365 million, the Harmon Shop Replacement Phase V – Stage 2 Project includes the demolition and disposal of the remaining west half of Building 6 including Building 5 and other miscellaneous structures, some of which will require asbestos abatement, the construction of a new six (6) track, double-ended EMU Running Repair and Support Shop (RRSS). This new RRSS will include a ground floor with 10 married pair vehicle repair positions, and a partial second floor with component repair workshops and multiple office areas. Other work for this project includes the completion of the medium voltage distribution 13.2KV loop with new transformers and their associated electric duct-banks, along with required site work and track work. Our Design-Build team presented an optimized alternative to Metro-North’s original foundation concept, which provided a safe, efficient and economical solution for the new structure. The project includes work along an active railroad included commissioning, efficient and effective use of railroad support personnel, controlled demolition, phased construction, realignment and reconstruction of site trackwork, as well as the completion of site utilities.
---