< Back to project list
|
|||||||||||||||||
Scope of Work:
This $6.7 Million Project for Westchester County Department of Public Works is for rehabilitation of the East Basin, West Basin and Edgewater Point Pump Stations located in Mamaroneck NY.
The project includes demolition of pumps, motors, HVAC, piping, valves, electric, controls and miscellaneous architectural features. ECCO will then furnish and install bar screens, sluice gates, pumps, piping, valves, meters, bypass pumping vaults, plumbing and HVAC systems, odor control systems, electrical and controls, and various structural/architectural features. The pump stations will be kept operational during construction using bypass pumping systems.
|