Scope of Work:
The scope of work includes the complete blasting & recoating of the existing Secondary Aeration piping along with the replacement of two 54 inch couplings; replacement of five Cooling Water Pumps and associated automatic strainers, piping & valves; replacement of the existing Plant Water system with a pre-engineered skid mounted system including new pumps, valves, flow meter and control panel; replacement of the existing High Pressure Washdown system with a pre-engineered skid mounted system including new pumps, valves, flow meter and control panel; replacement of the existing Compressed Air System including the compressors, driers, holding tanks, controls and piping; upgraded electrical equipment associated with the new equipment.
|